Cedar Creek data center program, FM 535
The project
Seven data center registrations filed against three addresses on FM 535 in Cedar Creek, Bastrop County, between 2025-07-14 and 2026-08-24.
In entitlement. The rail reads off the record: state or local building paperwork has been filed. Steps to the left shown ‘prior to tracking’ happened before The Scout began watching this project; we did not witness them.
Why it matters
The work window starts October 5, 2026, roughly six weeks after the filing. That is ahead of ERCOT’s December 10, 2026 target for its filing on the governor’s audit of large-load interconnection.
Three gating layers are live over Texas data center siting right now: Governor Abbott’s Aug. 3 statewide PUCT and ERCOT audit, the PUCT’s Aug. 20 approval of ERCOT’s Batch Zero good-cause exception covering roughly 300 facilities at 75 MW and above, and county-level moratorium activity elsewhere in the region. A $700 million filing landing inside that window is a data point about how operators are reading the pause.
What is a Scout Project Dossier, and why should I care?
Because we watch it until it stops producing a record. Every filing, every permit, everyone named on them – with phone numbers, the day they appear. This project is at Entitlement; the rest arrives as it moves.
$29 buys the file as it stands. A subscription buys everything it becomes.
The Scout – Austin Region. This record accumulates: it records the changes as the project moves, and never rewrites what came before.